ITAC Assessment: UW2518
ITAC logo
ITAC Assessment: UW2518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Liquid and Gas Oxygen and Nitrogen
NAICS 325120: Industrial Gas Manufacturing
SIC 2813: Industrial Gases
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 280,000
ft2
Annual Production 9,120
ton
Production Hrs. Annual 7,300
hrs
Location (State) Alaska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $950,986 8,107,200
kWh
Electricity Demand $494,286 15,481
kW-mo/yr
Electricity Fees $4,054 -
Natural Gas $95,099 8,482
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $17,739 19,710
lb
TOTAL YEARLY COSTS $1,562,164
RECOMMENDED SAVINGS* $269,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Increase in Production Savings
01 4.651: Install back-up equipment $172,619 $196,087 - - - - - $172,619
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $59,635 $40,500 $57,491
490,122
kWh
$2,144
-
kW-mo/yr
- - - -
03 2.7447: Install vinyl strip / high speed / air curtain doors $13,675 $64,800 - - $13,675
-
MMBtu
- - -
04 2.7134: Use photocell controls $795 $1,729 $671
5,719
kWh
$125
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,286 $28,047 $4,035
34,485
kWh
$251
-
kW-mo/yr
- - - -
06 2.4322: Use or replace with energy efficient substitutes $18,560 $100,800 - - - $17,739
-
lb
$821 -
TOTAL RECOMMENDED $269,571 $431,962 $62,197
530,327
kWh
$2,520
-
kW-mo/yr
$13,675
-
MMBtu
$17,739
-
lb
$821 $172,619
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs