Assessment Year | 2008 |
---|---|
Principal Product | fine paper |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $50 M to 100M |
# of Employees | 48 |
Plant Area |
160,000
ft2
|
Annual Production | 10,950
ton
|
Production Hrs. Annual | 8,520
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $829,451 | 10,061,141 |
kWh
|
$0.082 |
Electricity Demand | $335,304 | 23,238 |
kW-mo/yr
|
$14.43 |
Electricity Fees | $120,528 | - |
|
- |
Natural Gas | $1,320,657 | 122,732 |
MMBtu
|
$10.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $501,375 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $115,058 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $221,387 | $110,000 | - | - |
$221,387
-
MMBtu
|
|
02 | 2.2444: Use hot process fluids to preheat incoming process fluids | $147,853 | $540,000 |
$(-15,712.0)
(-190,678)
kWh
|
$(-3,882.0)
-
kW-mo/yr
|
$167,447
-
MMBtu
|
|
03 | 2.3322: Use existing dam to generate electricity | $110,112 | $939,500 |
$88,827
1,078,000
kWh
|
$21,285
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,946 | $18,000 |
$3,964
48,104
kWh
|
$982
-
kW-mo/yr
|
- | |
05 | 2.3321: Use steam pressure reduction to generate power | $8,663 | $5,000 |
$16,849
204,480
kWh
|
$4,156
-
kW-mo/yr
|
$(-12,342.0)
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,272 | - |
$4,272
51,845
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,142 | $20,000 |
$4,142
50,268
kWh
|
- | - | |
TOTAL RECOMMENDED | $501,375 | $1,632,500 |
$102,342
1,242,019
kWh
|
$22,541
-
kW-mo/yr
|
$376,492
-
MMBtu
|
||
TOTAL IMPLEMENTED | $115,058 | $957,500 |
$92,791
1,126,104
kWh
|
$22,267
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs