ITAC Assessment: MA0636
ITAC logo
ITAC Assessment: MA0636
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product fine paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 48
Plant Area 160,000
ft2
Annual Production 10,950
ton
Production Hrs. Annual 8,520
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $829,451 10,061,141
kWh
Electricity Demand $335,304 23,238
kW-mo/yr
Electricity Fees $120,528 -
Natural Gas $1,320,657 122,732
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $501,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $115,058

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $221,387 $110,000 - - $221,387
-
MMBtu
02 2.2444: Use hot process fluids to preheat incoming process fluids $147,853 $540,000 $(-15,712.0)
(-190,678)
kWh
$(-3,882.0)
-
kW-mo/yr
$167,447
-
MMBtu
03 2.3322: Use existing dam to generate electricity $110,112 $939,500 $88,827
1,078,000
kWh
$21,285
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,946 $18,000 $3,964
48,104
kWh
$982
-
kW-mo/yr
-
05 2.3321: Use steam pressure reduction to generate power $8,663 $5,000 $16,849
204,480
kWh
$4,156
-
kW-mo/yr
$(-12,342.0)
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,272 - $4,272
51,845
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,142 $20,000 $4,142
50,268
kWh
- -
TOTAL RECOMMENDED $501,375 $1,632,500 $102,342
1,242,019
kWh
$22,541
-
kW-mo/yr
$376,492
-
MMBtu
TOTAL IMPLEMENTED $115,058 $957,500 $92,791
1,126,104
kWh
$22,267
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs