ITAC Assessment: UW2401
ITAC logo
ITAC Assessment: UW2401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Other Aircraft Parts and Auxiliary Equipment Manufacturing
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 131
Plant Area 61,000
ft2
Annual Production 950,000
units
Production Hrs. Annual 8,568
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,101 4,322,533
kWh
Electricity Demand $51,855 8,466
kW-mo/yr
Electricity Fees $18,013 -
Natural Gas $636,069 96,856
MMBtu
TOTAL YEARLY COSTS $1,006,038
RECOMMENDED SAVINGS* $184,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $184,395

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 4.662: Level one – add communication using iiot devices to existing control system to modify operations $141,044 $149,500 $44,998
648,380
kWh
- $96,046
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $1,688 $3,000 $1,502
21,638
kWh
$186
-
kW-mo/yr
-
03 2.7232: Replace existing hvac unit with high efficiency model $1,711 $4,441 $(-1,384.0)
(-19,940)
kWh
$(-436.0)
-
kW-mo/yr
$3,531
-
MMBtu
04 2.3212: Optimize plant power factor $6,204 $23,347 - $6,204
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,098 $26,080 $6,317
91,035
kWh
$781
-
kW-mo/yr
-
06 2.2136: Install / repair insulation on steam lines $26,650 $58,013 - - $26,650
-
MMBtu
TOTAL RECOMMENDED $184,395 $264,381 $51,433
741,113
kWh
$6,735
-
kW-mo/yr
$126,227
-
MMBtu
TOTAL IMPLEMENTED $184,395 $264,381 $51,433
741,113
kWh
$6,735
-
kW-mo/yr
$126,227
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs