ITAC Assessment: UW2314
ITAC logo
ITAC Assessment: UW2314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Apple Orchards
NAICS 111331: Apple Orchards
SIC 0175: Deciduous Tree Fruits
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 700,000
ft2
Annual Production 518,750,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $287,718 18,836,027
kWh
Electricity Demand $124,587 35,095
kW-mo/yr
Electricity Fees $27,938 -
Natural Gas $19,804 1,670
MMBtu
Waste Disposal Costs
Water Usage $93,989 4,541
Tgal
TOTAL YEARLY COSTS $554,036
RECOMMENDED SAVINGS* $5,128 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $797

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4221: Install compressor air intakes in coolest locations $4,331 $2,251 $3,243
223,686
kWh
$1,088
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $701 $3,150 $431
29,746
kWh
$270
-
kW-mo/yr
03 2.7135: Install occupancy sensors $96 $180 $96
6,652
kWh
-
TOTAL RECOMMENDED $5,128 $5,581 $3,770
260,084
kWh
$1,358
-
kW-mo/yr
TOTAL IMPLEMENTED $797 $3,330 $527
36,398
kWh
$270
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs