ITAC Assessment: KG0089
ITAC logo
ITAC Assessment: KG0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Accessories for beverage industry
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 380
Plant Area 82,030
ft2
Annual Production 11,000,000
pieces
Production Hrs. Annual 5,020
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,376 2,747,362
kWh
Electricity Demand $47,392 7,072
kW-mo/yr
Electricity Fees $1,681 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,851 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.1113: Reduce combustion air flow to optimum $39,149 - n/a $39,149
3,232,122
kWh
- - -
02 2.1121: Use insulation in furnaces to facilitate heating / cooling $6,852 $790 n/a $6,852
565,651
kWh
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,955 $3,380 n/a $4,955
128,370
kWh
- - -
04 2.7261: Install timers and/or thermostats $4,400 - n/a $2,927
92,321
kWh
$1,473
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,294 $422 n/a $846
26,671
kWh
$448
-
kW-mo/yr
- -
06 2.7261: Install timers and/or thermostats $1,006 $600 n/a $1,006
31,653
kWh
- - -
07 3.8136: Switch to a solvent that can be cleaned and re-used $4,062 $7,900 n/a - - $4,062
-
lb
-
08 3.5315: Lease / purchase baler; sell cardboard to recycler $550 $300 n/a - - $550
-
lb
-
09 3.5248: Separate and recycle scrap metal to foundry or for sale $258 - n/a - - $258
-
lb
-
10 4.423: Move product using mechanical means $27,325 $1,612 n/a - - - $27,325
TOTAL RECOMMENDED $89,851 $15,004 $55,735
4,076,788
kWh
$1,921
-
kW-mo/yr
$4,870
-
lb
$27,325
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs