ITAC Assessment: UW2212
ITAC logo
ITAC Assessment: UW2212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Packaging Machinery Manufacturing
NAICS 333993: Packaging Machinery Manufacturing
SIC 3565: Packaging Machinery
Sales Range $50
M
to 100
M
# of Employees 105
Plant Area 66,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,425 2,250,126
kWh
Electricity Demand $43,644 6,948
kW-mo/yr
Electricity Fees $27,753 -
Natural Gas $22,648 2,010
MMBtu
TOTAL YEARLY COSTS $230,470
RECOMMENDED SAVINGS* $2,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,637

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $2,231 - - - $2,231
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $405 - $254
4,190
kWh
$152
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $327 $160 $205
3,379
kWh
$122
-
kW-mo/yr
-
TOTAL RECOMMENDED $2,964 $160 $459
7,568
kWh
$274
-
kW-mo/yr
$2,231
-
MMBtu
TOTAL IMPLEMENTED $2,637 - $254
4,190
kWh
$152
-
kW-mo/yr
$2,231
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs