ITAC Assessment: UW2208
ITAC logo
ITAC Assessment: UW2208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 40,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,664 1,464,480
kWh
Electricity Demand $13,208 2,220
kW-mo/yr
Electricity Fees $7,750 -
Natural Gas $206,577 32,061
MMBtu
TOTAL YEARLY COSTS $334,200
RECOMMENDED SAVINGS* $5,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,947

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $643 - - - $643
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $954 $2,680 $954
13,097
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $1,686 $122 $1,516
20,817
kWh
$170
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,664 $2,080 $2,396
32,895
kWh
$268
-
kW-mo/yr
-
TOTAL RECOMMENDED $5,947 $4,882 $4,866
66,809
kWh
$438
-
kW-mo/yr
$643
-
MMBtu
TOTAL IMPLEMENTED $5,947 $4,882 $4,866
66,809
kWh
$438
-
kW-mo/yr
$643
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs