ITAC Assessment: UW2207
ITAC logo
ITAC Assessment: UW2207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product All Other Miscellaneous Food Manufacturing
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 40,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 6,188
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,836 866,392
kWh
Electricity Fees $6,923 -
Natural Gas $23,352 2,158
MMBtu
TOTAL YEARLY COSTS $119,112
RECOMMENDED SAVINGS* $12,060 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,477

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,161 - $2,161
21,075
kWh
02 2.4221: Install compressor air intakes in coolest locations $685 $112 $685
6,683
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,582 $12,124 $5,582
54,443
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,631 $2,080 $3,631
35,428
kWh
TOTAL RECOMMENDED $12,060 $14,316 $12,060
117,629
kWh
TOTAL IMPLEMENTED $6,477 $2,192 $6,477
63,186
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs