ITAC Assessment: GT0610
ITAC logo
ITAC Assessment: GT0610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Control Panels
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 28,800
ft2
Annual Production 3,800,000
lb
Production Hrs. Annual 2,040
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,166 1,046,600
kWh
Electricity Demand $55,847 3,728
kW-mo/yr
Electricity Fees $4,100 -
Natural Gas $8,641 1,344
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,570

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.8112: Combine utility meters $3,850 - - - - - - - - $3,850 - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,580 $500 $1,332
53,341
kWh
$2,198
-
kW-mo/yr
$2,050 - - - - - - - -
03 2.7111: Reduce illumination to minimum necessary levels $1,319 $510 $315
12,603
kWh
$940
-
kW-mo/yr
$64 - - - - - - - -
04 2.2443: Re-use or recycle hot or cold process exhaust air $5,510 $15,700 $621
24,912
kWh
$3,589
-
kW-mo/yr
$168 $1,132
-
MMBtu
- - - - - - -
05 4.423: Move product using mechanical means $13,890 $12,000 - - - - - $4,750
-
lb
$9,140 - - - -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $45,100 $8,000 - - - - - - - - $45,100 - -
07 2.7261: Install timers and/or thermostats $1,530 $4,350 $1,170
46,893
kWh
- $7 $353
-
MMBtu
- - - - - - -
08 3.5142: Treat and reuse equipment cleaning solutions $7,016 $10,120 - - - - $158
-
Tgal
- - - - $6,748 $110
-
Tgal
TOTAL RECOMMENDED $83,795 $51,180 $3,438
137,749
kWh
$6,727
-
kW-mo/yr
$2,289 $1,485
-
MMBtu
$158
-
Tgal
$4,750
-
lb
$9,140 $3,850 $45,100 $6,748 $110
-
Tgal
TOTAL IMPLEMENTED $64,570 $20,500 $1,332
53,341
kWh
$2,198
-
kW-mo/yr
$2,050 - - $4,750
-
lb
$9,140 - $45,100 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs