ITAC Assessment: MA0435
ITAC logo
ITAC Assessment: MA0435
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Paper products for medical industry
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 110,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,616 1,325,029
kWh
Electricity Demand $27,386 3,515
kW-mo/yr
Fuel Oil #2 $28,824 7,280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,424

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.7224: Reduce space conditioning during non-working hours $689 $128 $643
7,034
kWh
$46
-
kW-mo/yr
-
02 2.7224: Reduce space conditioning during non-working hours $281 $328 - - $281
-
MMBtu
03 2.1213: Direct warmest air to combustion intake $313 $472 - - $313
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $521 $294 - - $521
-
MMBtu
05 2.4321: Upgrade obsolete equipment $1,957 $350 $1,341
14,654
kWh
$616
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $590 $248 $590
6,448
kWh
- -
TOTAL RECOMMENDED $4,351 $1,820 $2,574
28,136
kWh
$662
-
kW-mo/yr
$1,115
-
MMBtu
TOTAL IMPLEMENTED $1,424 $1,014 $590
6,448
kWh
- $834
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs