ITAC Assessment: CO0217
ITAC logo
ITAC Assessment: CO0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FINISHING ON METAL PARTS
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area
n/a
Annual Production 280
thousand feet
Production Hrs. Annual 4,500
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,561 799,824
kWh
Natural Gas $35,641 9,567
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,605 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,605

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,147 $1,550 $12,168
166,178
kWh
$(-3,021.0)
-
MMBtu
02 2.2531: Re-size charging openings or add movable cover or door $1,560 $2,500 - $1,560
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,180 $1,000 - $1,180
-
MMBtu
04 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,160 $1,150 $530
7,327
kWh
$630
-
MMBtu
05 2.4133: Use most efficient type of electric motors $218 $325 $218
2,931
kWh
-
06 2.6232: Install set-back timers $340 $1,040 $340
4,689
kWh
-
TOTAL RECOMMENDED $13,605 $7,565 $13,256
181,125
kWh
$349
-
MMBtu
TOTAL IMPLEMENTED $13,605 $7,565 $13,256
181,125
kWh
$349
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs