ITAC Assessment: UW2204
ITAC logo
ITAC Assessment: UW2204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Aircraft Manufacturing
NAICS 336411: Aircraft Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 600
Plant Area 89,784
ft2
Annual Production 1,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,147 1,333,281
kWh
Electricity Demand $1,855 34
kW-mo/yr
Electricity Fees $5,756 -
Natural Gas $11,020 1,048
MMBtu
TOTAL YEARLY COSTS $135,778
RECOMMENDED SAVINGS* $107,079 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,184

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $6,178 $7,000 - - $6,178
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,789 $13,171 $4,474
50,901
kWh
$10,315
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $11,216 $1,580 $3,403
39,203
kWh
$7,813
-
kW-mo/yr
-
04 2.9114: Use solar heat to make electricty $74,895 $444,104 $74,895
852,045
kWh
- -
TOTAL RECOMMENDED $107,079 $465,855 $82,772
942,149
kWh
$18,128
-
kW-mo/yr
$6,178
-
MMBtu
TOTAL IMPLEMENTED $32,184 $21,751 $7,877
90,104
kWh
$18,128
-
kW-mo/yr
$6,178
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs