ITAC Assessment: UW0054
ITAC logo
ITAC Assessment: UW0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Jet Propulsion Systems
NAICS 336419: Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 430,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $520,672 6,086,207
kWh
Electricity Demand $57,332 14,406
kW-mo/yr
Natural Gas $208,031 29,471
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,566 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7441: Replace broken windows and/or window sash $25,410 $190,516 $25,276
295,627
kWh
$134
-
kW-mo/yr
-
02 2.2414: Use waste heat from hot flue gases to preheat $6,537 $50,000 - - $6,537
-
MMBtu
03 2.7135: Install occupancy sensors $3,619 $2,700 $3,619
42,326
kWh
- -
TOTAL RECOMMENDED $35,566 $243,216 $28,895
337,953
kWh
$134
-
kW-mo/yr
$6,537
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs