ITAC Assessment: UW0041
ITAC logo
ITAC Assessment: UW0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Custom Mold Chocolate Bars
NAICS 311351: Chocolate and Confectionery Manufacturing from Cacao Beans
SIC 2064: Candy and Other Confectionery Products
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 40,000
ft2
Annual Production 50,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,208 884,160
kWh
Natural Gas $14,556 1,216
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,272 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,272

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6211: Conserve energy by efficient use of vending machines $1,098 $866 $702
8,030
kWh
$396
-
kW-mo/yr
02 2.2622: Replace existing chiller with high efficiency model $653 $1,306 $586
8,920
kWh
$67
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $521 $261 $478
5,468
kWh
$43
-
kW-mo/yr
TOTAL RECOMMENDED $2,272 $2,433 $1,766
22,418
kWh
$506
-
kW-mo/yr
TOTAL IMPLEMENTED $2,272 $2,433 $1,766
22,418
kWh
$506
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs