ITAC Assessment: UU0303
ITAC logo
ITAC Assessment: UU0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Pullups
NAICS 322291: Sanitary Paper Product Manufacturing
SIC 2676: Sanitary Paper Products
Sales Range greater than $500
M
# of Employees 100
Plant Area 1,300,000
ft2
Annual Production 20,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $775,663 23,665,920
kWh
Electricity Demand $664,471 41,844
kW-mo/yr
Electricity Fees $479,162 -
Natural Gas $168,468 24,145
MMBtu
Waste Disposal Costs
Water Usage $45,081 14,714
Tgal
TOTAL YEARLY COSTS $2,132,845
RECOMMENDED SAVINGS* $238,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
01 2.2623: Minimize condenser cooling water temperature $8,440 $18,000 $8,440
257,342
kWh
- - - -
02 2.3113: Make ice during off peak hours for cooling $56,998 $810,000 - $56,998 - - -
03 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $64,472 $177,600 $3,397
103,584
kWh
- $61,075
-
MMBtu
- -
04 3.4151: Minimize water usage $56,001 $110,000 - - - $329
-
Tgal
$55,672
05 2.7135: Install occupancy sensors $6,228 $12,600 $6,228
185,523
kWh
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $46,708 $314,394 $46,708
1,424,040
kWh
- - - -
TOTAL RECOMMENDED $238,847 $1,442,594 $64,773
1,970,489
kWh
$56,998 $61,075
-
MMBtu
$329
-
Tgal
$55,672
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs