ITAC Assessment: IC0270
ITAC logo
ITAC Assessment: IC0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Office Space
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 25
Plant Area 16,160
ft2
Annual Production 1
units
Production Hrs. Annual 2,698
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,861 701,743
kWh
TOTAL YEARLY COSTS $67,861
RECOMMENDED SAVINGS* $19,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,974

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $106 $300 $106
1,091
kWh
02 2.7135: Install occupancy sensors $82 $440 $82
842
kWh
03 2.4321: Upgrade obsolete equipment $369 $400 $369
3,690
kWh
04 2.7221: Lower temperature during the winter season and vice-versa $18,786 $106 $18,786
193,662
kWh
TOTAL RECOMMENDED $19,343 $1,246 $19,343
199,285
kWh
TOTAL IMPLEMENTED $18,974 $846 $18,974
195,595
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs