| Assessment Year | 2026 |
|---|---|
| Principal Product | Firearm Sights |
| NAICS | 332994: Small Arms, Ordnance, and Ordnance Accessories Manufacturing |
| SIC | 3484: Small Arms |
| Sales Range | $10 M to 50M |
| # of Employees | 43 |
| Plant Area |
40,000
ft2
|
| Annual Production | 800,000
units
|
| Production Hrs. Annual | 4,900
hrs
|
| Location (State) | Wyoming |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $42,420 | 848,787 |
kWh
|
$0.050 |
| Electricity Demand | $73,400 | 3,459 |
kW-mo/yr
|
$21.22 |
| TOTAL YEARLY COSTS | $115,820 | |||
| RECOMMENDED SAVINGS* | $48,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2211: Use optimum temperature | $4,230 | $4,540 |
$660
13,320
kWh
|
- | $3,570 | |
| 02 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $29,060 | $16,500 |
$(-690.0)
(-13,860)
kWh
|
$(-250.0)
-
kW-mo/yr
|
$30,000 | |
| 03 | 2.4224: Upgrade controls on compressors | $7,737 | $40,800 |
$4,175
83,500
kWh
|
$3,562
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,970 | $1,160 |
$1,970
39,400
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,180 | $3,030 |
$625
12,500
kWh
|
$555
-
kW-mo/yr
|
- | |
| 06 | 2.6218: Turn off equipment when not in use | $3,000 | $550 |
$3,000
60,300
kWh
|
- | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,090 | $230 |
$1,090
21,733
kWh
|
- | - | |
| TOTAL RECOMMENDED | $48,267 | $66,810 |
$10,830
216,893
kWh
|
$3,867
-
kW-mo/yr
|
$33,570 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs