Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Firearm Sights
NAICS 332994: Small Arms, Ordnance, and Ordnance Accessories Manufacturing
SIC 3484: Small Arms
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 40,000
ft2
Annual Production 800,000
units
Production Hrs. Annual 4,900
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,420 848,787
kWh
Electricity Demand $73,400 3,459
kW-mo/yr
TOTAL YEARLY COSTS $115,820
RECOMMENDED SAVINGS* $48,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.2211: Use optimum temperature $4,230 $4,540 $660
13,320
kWh
- $3,570
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $29,060 $16,500 $(-690.0)
(-13,860)
kWh
$(-250.0)
-
kW-mo/yr
$30,000
03 2.4224: Upgrade controls on compressors $7,737 $40,800 $4,175
83,500
kWh
$3,562
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,970 $1,160 $1,970
39,400
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $1,180 $3,030 $625
12,500
kWh
$555
-
kW-mo/yr
-
06 2.6218: Turn off equipment when not in use $3,000 $550 $3,000
60,300
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,090 $230 $1,090
21,733
kWh
- -
TOTAL RECOMMENDED $48,267 $66,810 $10,830
216,893
kWh
$3,867
-
kW-mo/yr
$33,570
TOTAL IMPLEMENTED - - - - -