Assessment Year | 2025 |
---|---|
Principal Product | Machined parts |
NAICS | 332510: Hardware Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
42,000
ft2
|
Annual Production | 1,500,000
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $61,096 | 1,697,100 |
kWh
|
$0.036 |
Electricity Demand | $58,644 | 3,600 |
kW-mo/yr
|
$16.29 |
Electricity Fees | $34,291 | - |
|
- |
Natural Gas | $39,870 | 3,962 |
MMBtu
|
$10.06 |
TOTAL YEARLY COSTS | $193,901 | |||
RECOMMENDED SAVINGS* | $34,668 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $3,730 | $6,750 | - | - | $3,730 | - | - | - | |
02 | 2.3191: Use demand controller or load shedder | $2,200 | $6,000 | - | - | $2,200 | - | - | - | |
03 | 2.2612: Use cooling tower water instead of refrigeration | $6,322 | $41,100 |
$4,792
133,115
kWh
|
$2,948
-
kW-mo/yr
|
- | - |
$(-1,419.0)
-
Tgal
|
- | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $2,650 | $7,080 | - | - | - |
$2,650
-
MMBtu
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,456 | $3,600 |
$906
25,161
kWh
|
$551
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $3,113 | $6,867 |
$1,924
53,436
kWh
|
$1,189
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.1194: Use automatic flow control | $2,903 | $6,218 | - |
$2,903
-
kW-mo/yr
|
- | - | - | - | |
08 | 3.4145: Use magnetic technology to treat water | $12,294 | $19,900 |
$(-529.8)
14,717
kWh
|
$(-328.4)
-
kW-mo/yr
|
- |
$24,144
-
MMBtu
|
- | $(-10,992.0) | |
TOTAL RECOMMENDED | $34,668 | $97,515 |
$7,092
226,429
kWh
|
$7,263
-
kW-mo/yr
|
$5,930 |
$26,794
-
MMBtu
|
$(-1,419.0)
-
Tgal
|
$(-10,992.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs