ITAC Assessment: UU0262
ITAC logo
ITAC Assessment: UU0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Ceramic Substrates
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 39,229
ft2
Annual Production 6,000,000
units
Production Hrs. Annual 5,880
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,625 718,744
kWh
Electricity Demand $38,896 2,307
kW-mo/yr
Electricity Fees $22,088 -
Natural Gas $213,142 26,721
MMBtu
Other Gas $46,454 3,718
MMBtu
TOTAL YEARLY COSTS $352,205
RECOMMENDED SAVINGS* $73,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.2693: Use waste heat steam for absorption refrigeration $12,361 $217,800 $7,086
157,471
kWh
$6,130
-
kW-mo/yr
- - $(-855.0)
02 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $14,276 $180,000 $12,800
290,000
kWh
$6,676
-
kW-mo/yr
- - $(-5,200.0)
03 2.2511: Insulate bare equipment $24,314 $29,878 - - - $24,314
-
MMBtu
-
04 2.7251: Reduce air conditioning load by evaporating water from roof $13,561 $178,488 $8,097
184,032
kWh
$6,464
-
kW-mo/yr
- - $(-1,000.0)
05 2.4322: Use or replace with energy efficient substitutes $762 $2,640 $301
6,694
kWh
$461
-
kW-mo/yr
- - -
06 2.6242: Minimize operation of equipment maintained in standby condition $720 $1,680 $394
8,753
kWh
$326
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,117 $834 $1,219
27,706
kWh
$898
-
kW-mo/yr
- - -
08 2.3212: Optimize plant power factor $5,129 $12,300 - - $5,129 - -
TOTAL RECOMMENDED $73,240 $623,620 $29,897
674,656
kWh
$20,955
-
kW-mo/yr
$5,129 $24,314
-
MMBtu
$(-7,055.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs