ITAC Assessment: UU0251
ITAC logo
ITAC Assessment: UU0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Power distribution units
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 237,000
ft2
Annual Production 300
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,396 1,761,600
kWh
Electricity Demand $60,847 4,953
kW-mo/yr
Electricity Fees $31,884 -
Natural Gas $94,589 7,832
MMBtu
LPG $19,493 1,136
MMBtu
TOTAL YEARLY COSTS $270,208
RECOMMENDED SAVINGS* $116,512 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,022

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $38,394 $100,000 - - $38,394 - - -
02 2.7442: Keep doors and windows shut when not on use $27,500 $13,788 - - - $27,500
-
MMBtu
- -
03 2.8113: Purchase gas directly from a contract gas supplier $23,190 $1,500 - - - - - $23,190
04 2.2437: Recover waste heat from equipment $9,830 $19,570 - - - $9,830
-
MMBtu
- -
05 4.811: Demolish old building to reduce tax and insurance bills $8,918 $750 - - - - - $8,918
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,210 $6,486 $6,006
98,514
kWh
$204
-
kW-mo/yr
- - - -
07 2.1321: Replace fossil fuel equipment with electrical equipment $2,290 $5,750 - - - - $2,290
-
MMBtu
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $180 $300 $180
5,013
kWh
- - - - -
TOTAL RECOMMENDED $116,512 $148,144 $6,186
103,527
kWh
$204
-
kW-mo/yr
$38,394 $37,330
-
MMBtu
$2,290
-
MMBtu
$32,108
TOTAL IMPLEMENTED $81,022 $121,024 $6,006
98,514
kWh
$204
-
kW-mo/yr
$38,394 $27,500
-
MMBtu
- $8,918
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs