ITAC Assessment: WM0217
ITAC logo
ITAC Assessment: WM0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 4
Plant Area 44,888
ft2
Annual Production 2,920,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $364,198 7,193,879
kWh
Electricity Demand $176,323 12,925
kW-mo/yr
Electricity Fees $38,373 -
Natural Gas $56,257 6,140
MMBtu
Waste Disposal Costs
Water Usage $7,053 530
Tgal
TOTAL YEARLY COSTS $642,204
RECOMMENDED SAVINGS* $14,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $9,218 $9,231 - - $9,218
-
MMBtu
02 2.7224: Reduce space conditioning during non-working hours $2,160 - $2,160
42,336
kWh
- -
03 2.7444: Close holes and openings in building such as broken windows $1,253 $882 - - $1,253
-
MMBtu
04 2.7221: Lower temperature during the winter season and vice-versa $1,029 - $367
7,191
kWh
$134
-
kW-mo/yr
$529
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $564 $632 $306
6,001
kWh
$258
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $320 $180 $235
4,600
kWh
$86
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $255 $480 $138
2,711
kWh
$117
-
kW-mo/yr
-
TOTAL RECOMMENDED $14,800 $11,405 $3,206
62,839
kWh
$595
-
kW-mo/yr
$11,000
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs