Assessment Year | 2023 |
---|---|
Principal Product | Medical Devices |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
650,000
ft2
|
Annual Production | 500,000,000
units
|
Production Hrs. Annual | 8,616
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,767,347 | 48,333,600 |
kWh
|
$0.037 | |
Electricity Demand | $1,200,366 | 75,510 |
kW-mo/yr
|
$15.90 | |
Natural Gas | $398,097 | 52,255 |
MMBtu
|
$7.62 | |
Waste Disposal Costs | |||||
Water Usage | $125,184 | 23,005 |
Tgal
|
$5.44 | |
TOTAL YEARLY COSTS | $3,490,994 | ||||
RECOMMENDED SAVINGS* | $62,598 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $36,935 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3112: Store heated/ cooled water for use during peak demand periods | $19,636 | $127,500 |
$5,167
-
kWh
|
$14,469
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $14,519 | $14,890 |
$11,912
322,400
kWh
|
$2,607
-
kW-mo/yr
|
- | - | |
03 | 2.7311: Ventilation system to shut off when room is not in use | $6,518 | $19,160 |
$2,291
61,920
kWh
|
$3,983
-
kW-mo/yr
|
$244
-
MMBtu
|
- | |
04 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $6,026 | $30,128 |
$1,240
33,506
kWh
|
$5,535
-
kW-mo/yr
|
- |
$(-749.4)
-
Tgal
|
|
05 | 2.9114: Use solar heat to make electricty | $15,898 | $263,547 |
$15,898
429,699
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $62,598 | $455,225 |
$36,508
847,525
kWh
|
$26,595
-
kW-mo/yr
|
$244
-
MMBtu
|
$(-749.4)
-
Tgal
|
||
TOTAL IMPLEMENTED | $36,935 | $297,597 |
$30,101
814,019
kWh
|
$6,590
-
kW-mo/yr
|
$244
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs