ITAC Assessment: UU0220
ITAC logo
ITAC Assessment: UU0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Heating elements
NAICS 333994: Industrial Process Furnace and Oven Manufacturing
SIC 3567: Industrial Process Furnaces and Ovens
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 184,600
ft2
Annual Production 400,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,590 4,654,255
kWh
Electricity Demand $222,987 11,596
kW-mo/yr
Natural Gas $125,277 25,370
MMBtu
TOTAL YEARLY COSTS $501,854
RECOMMENDED SAVINGS* $78,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,135

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7234: Use heat pump for space conditioning $67,069 - $6,591
199,738
kWh
- - $60,478
-
MMBtu
02 2.3212: Optimize plant power factor $3,986 $13,500 - - $3,986 -
03 2.2425: Use flue gases to heat process or service water $2,450 $3,366 - - - $2,450
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $3,245 $3,810 $227
6,869
kWh
$3,018
-
kW-mo/yr
- -
05 2.6241: Reduce temperature of process equipment when on standby $1,160 $50 $1,160
35,100
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $920 $1,200 $708
21,465
kWh
$212
-
kW-mo/yr
- -
TOTAL RECOMMENDED $78,830 $21,926 $8,686
263,172
kWh
$3,230
-
kW-mo/yr
$3,986 $62,928
-
MMBtu
TOTAL IMPLEMENTED $73,135 $14,750 $8,459
256,303
kWh
$212
-
kW-mo/yr
$3,986 $60,478
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings