Assessment Year | 2023 |
---|---|
Principal Product | Heating elements |
NAICS | 333994: Industrial Process Furnace and Oven Manufacturing |
SIC | 3567: Industrial Process Furnaces and Ovens |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
184,600
ft2
|
Annual Production | 400,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $153,590 | 4,654,255 |
kWh
|
$0.033 |
Electricity Demand | $222,987 | 11,596 |
kW-mo/yr
|
$19.23 |
Natural Gas | $125,277 | 25,370 |
MMBtu
|
$4.94 |
TOTAL YEARLY COSTS | $501,854 | |||
RECOMMENDED SAVINGS* | $78,830 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $73,135 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7234: Use heat pump for space conditioning | $67,069 | - |
$6,591
199,738
kWh
|
- | - |
$60,478
-
MMBtu
|
|
02 | 2.3212: Optimize plant power factor | $3,986 | $13,500 | - | - | $3,986 | - | |
03 | 2.2425: Use flue gases to heat process or service water | $2,450 | $3,366 | - | - | - |
$2,450
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $3,245 | $3,810 |
$227
6,869
kWh
|
$3,018
-
kW-mo/yr
|
- | - | |
05 | 2.6241: Reduce temperature of process equipment when on standby | $1,160 | $50 |
$1,160
35,100
kWh
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $920 | $1,200 |
$708
21,465
kWh
|
$212
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $78,830 | $21,926 |
$8,686
263,172
kWh
|
$3,230
-
kW-mo/yr
|
$3,986 |
$62,928
-
MMBtu
|
||
TOTAL IMPLEMENTED | $73,135 | $14,750 |
$8,459
256,303
kWh
|
$212
-
kW-mo/yr
|
$3,986 |
$60,478
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs