ITAC Assessment: LL0217
ITAC logo
ITAC Assessment: LL0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Rice Milling
NAICS 311212: Rice Milling
SIC 2044: Rice Milling
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 500,000
ft2
Annual Production 264,000,000
lb
Production Hrs. Annual 5,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,075 5,562,010
kWh
Electricity Demand $136,620 30,483
kW-mo/yr
Electricity Fees $15,224 -
Natural Gas $84,232 10,561
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,451

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,879 $1,500 $2,774
58,419
kWh
- $105 - -
02 2.4239: Eliminate or reduce compressed air usage $2,756 $1,750 $2,655
55,923
kWh
- $101 - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $816 $30 $786
16,562
kWh
- $30 - -
04 2.7135: Install occupancy sensors $783 - $754
15,877
kWh
- $29 - -
05 2.7111: Reduce illumination to minimum necessary levels $82 - $55
1,098
kWh
$27
-
kW-mo/yr
- - -
06 4.611: Begin a practice of predictive / preventative maintenance $44,500 - - - - $42,000 $2,500
07 4.611: Begin a practice of predictive / preventative maintenance $4,020 - - - - $4,020 -
TOTAL RECOMMENDED $55,836 $3,280 $7,024
147,879
kWh
$27
-
kW-mo/yr
$265 $46,020 $2,500
TOTAL IMPLEMENTED $6,451 $3,280 $6,215
130,904
kWh
- $236 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs