ITAC Assessment: UD0553
ITAC logo
ITAC Assessment: UD0553
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Distilled & rectified liquors and bottling of blended liquor
NAICS
n/a
SIC 2085: Distilled and Blended Liquors
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 198,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,398 3,353,458
kWh
Electricity Demand $149,365 10,416
kW-mo/yr
Natural Gas $159,390 37,950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,971 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,271

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
01 3.7212: Improved material handling (mixing and transfer) $21,875 $500 - - - $21,875
-
lb
- -
02 2.2136: Install / repair insulation on steam lines $14,410 $12,100 - - $14,410
-
MMBtu
- - -
03 3.1163: Use plastic pallets instead of wood $5,600 - - - - - $5,600 -
04 2.4225: Install common header on compressors $12,000 $2,000 $2,567
123,974
kWh
$6,023
-
kW-mo/yr
- - $1,065 $2,345
-
Tgal
05 2.7241: Install outside air damper / economizer on hvac unit $11,947 $10,000 $11,715
195,193
kWh
- $232
-
MMBtu
- - -
06 2.6213: Turn off steam / hot water lines leading to space heating units $8,274 $1,000 - - $8,274
-
MMBtu
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $7,594 $13,677 $5,622
271,688
kWh
$1,972
-
kW-mo/yr
- - - -
08 2.4224: Upgrade controls on compressors $5,271 $800 - - - - - $5,271
-
Tgal
TOTAL RECOMMENDED $86,971 $40,077 $19,904
590,855
kWh
$7,995
-
kW-mo/yr
$22,916
-
MMBtu
$21,875
-
lb
$6,665 $7,616
-
Tgal
TOTAL IMPLEMENTED $5,271 $800 - - - - - $5,271
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs