Assessment Year | 2021 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 237110: Water and Sewer Line and Related Structures Construction |
SIC | 1623: Water, Sewer, Pipeline, and Communications and Power Line Construction |
Sales Range | $1 M to 5M |
# of Employees | 6 |
Plant Area |
71,000
ft2
|
Annual Production | 803,534
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,659 | 3,973,798 |
kWh
|
$0.036 |
Electricity Demand | $142,659 | 8,784 |
kW-mo/yr
|
$16.24 |
Natural Gas | $20,198 | 2,889 |
MMBtu
|
$6.99 |
TOTAL YEARLY COSTS | $305,517 | |||
RECOMMENDED SAVINGS* | $39,972 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,769 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $19,749 | $38,000 |
$12,193
339,645
kWh
|
$7,556
-
kW-mo/yr
|
- | - | |
02 | 2.8113: Purchase gas directly from a contract gas supplier | $7,428 | $14,400 | - | - | $7,428 | - | |
03 | 2.9113: Use solar heat for heat | $4,877 | $10,800 | - | - | - |
$4,877
-
MMBtu
|
|
04 | 2.7221: Lower temperature during the winter season and vice-versa | $3,303 | $150 | - | - | - |
$3,303
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,175 | $4,613 |
$1,154
32,132
kWh
|
$1,021
-
kW-mo/yr
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,172 | $2,482 |
$1,341
37,354
kWh
|
$831
-
kW-mo/yr
|
- | - | |
07 | 2.6218: Turn off equipment when not in use | $154 | $71 |
$154
4,287
kWh
|
- | - | - | |
08 | 2.7221: Lower temperature during the winter season and vice-versa | $114 | $50 |
$114
3,174
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $39,972 | $70,566 |
$14,955
416,592
kWh
|
$9,408
-
kW-mo/yr
|
$7,428 |
$8,180
-
MMBtu
|
||
TOTAL IMPLEMENTED | $32,769 | $57,213 |
$13,461
374,951
kWh
|
$8,577
-
kW-mo/yr
|
$7,428 |
$3,303
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs