| Assessment Year | 2026 |
|---|---|
| Principal Product | Transparencies |
| NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 220 |
| Plant Area |
358,093
ft2
|
| Annual Production | 10,000,000
units
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,747,516 | 16,140,010 |
kWh
|
$0.11 | |
| Electricity Demand | $1,400,721 | 26,788 |
kW-mo/yr
|
$52.29 | |
| Electricity Fees | $67,373 | - |
|
- | |
| LPG | $32,000 | 1,285 |
MMBtu
|
$24.90 | |
| Waste Disposal Costs | |||||
| Water Usage | $63 | 32,294 |
Tgal
|
$0.002 | |
| Water Disposal | $9,964 | 32,294 |
Tgal
|
$0.31 | |
| Other Liquid (non-haz) | $227,811 | 1 |
gal
|
$227,811.00 | |
| TOTAL YEARLY COSTS | $3,485,448 | ||||
| RECOMMENDED SAVINGS* | $1,669,457 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $1,122,941 | $8,675,400 |
$369,651
3,504,060
kWh
|
$753,290
-
kW-mo/yr
|
- | |
| 02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $291,670 | $484,203 |
$291,670
2,693,166
kWh
|
- | - | |
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $87,398 | $247,250 |
$87,398
807,001
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $51,002 | $26,100 |
$28,753
265,495
kWh
|
$22,249
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $34,047 | $4,400 |
$20,070
185,323
kWh
|
$13,977
-
kW-mo/yr
|
- | |
| 06 | 2.2622: Replace existing chiller with high efficiency model | $30,411 | $75,000 |
$30,411
280,800
kWh
|
- | - | |
| 07 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $24,701 | $112,000 |
$(-7,299.0)
(-67,392)
kWh
|
- |
$32,000
-
MMBtu
|
|
| 08 | 2.7135: Install occupancy sensors | $24,582 | $33,150 |
$13,857
127,955
kWh
|
$10,725
-
kW-mo/yr
|
- | |
| 09 | 2.2442: Preheat combustion air with waste heat | $2,705 | $5,000 |
$2,705
24,978
kWh
|
- | - | |
| TOTAL RECOMMENDED | $1,669,457 | $9,662,503 |
$837,216
7,821,386
kWh
|
$800,241
-
kW-mo/yr
|
$32,000
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs