Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Transparencies
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 220
Plant Area 358,093
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,747,516 16,140,010
kWh
Electricity Demand $1,400,721 26,788
kW-mo/yr
Electricity Fees $67,373 -
LPG $32,000 1,285
MMBtu
Waste Disposal Costs
Water Usage $63 32,294
Tgal
Water Disposal $9,964 32,294
Tgal
Other Liquid (non-haz) $227,811 1
gal
TOTAL YEARLY COSTS $3,485,448
RECOMMENDED SAVINGS* $1,669,457 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.9114: Use solar heat to make electricty $1,122,941 $8,675,400 $369,651
3,504,060
kWh
$753,290
-
kW-mo/yr
-
02 2.7491: Insulate glazing, walls, ceilings, and roofs $291,670 $484,203 $291,670
2,693,166
kWh
- -
03 2.7232: Replace existing hvac unit with high efficiency model $87,398 $247,250 $87,398
807,001
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $51,002 $26,100 $28,753
265,495
kWh
$22,249
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $34,047 $4,400 $20,070
185,323
kWh
$13,977
-
kW-mo/yr
-
06 2.2622: Replace existing chiller with high efficiency model $30,411 $75,000 $30,411
280,800
kWh
- -
07 2.8227: Adjust / maintain fork lift trucks for most efficient operation $24,701 $112,000 $(-7,299.0)
(-67,392)
kWh
- $32,000
-
MMBtu
08 2.7135: Install occupancy sensors $24,582 $33,150 $13,857
127,955
kWh
$10,725
-
kW-mo/yr
-
09 2.2442: Preheat combustion air with waste heat $2,705 $5,000 $2,705
24,978
kWh
- -
TOTAL RECOMMENDED $1,669,457 $9,662,503 $837,216
7,821,386
kWh
$800,241
-
kW-mo/yr
$32,000
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs