| Assessment Year | 2021 |
|---|---|
| Principal Product | PVC Products |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 180 |
| Plant Area |
50,000
ft2
|
| Annual Production | 156,000,000
lb
|
| Production Hrs. Annual | 8,700
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $915,031 | 14,241,856 |
kWh
|
$0.064 | |
| Natural Gas | $9,325 | 1,259 |
MMBtu
|
$7.41 | |
| Waste Disposal Costs | |||||
| Water Usage | $8,680 | 8,378 |
Tgal
|
$1.04 | |
| TOTAL YEARLY COSTS | $933,036 | ||||
| RECOMMENDED SAVINGS* | $40,277 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $15,028 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Usage Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2692: Use outside cold water source as a supply of cooling water | $21,754 | $64,000 |
$33,319
520,608
kWh
|
$(-11,565.0)
-
Tgal
|
|
| 02 | 2.4239: Eliminate or reduce compressed air usage | $6,198 | $3,400 |
$6,198
96,842
kWh
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,814 | $14,000 |
$5,814
90,837
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,525 | $11,563 |
$2,525
39,453
kWh
|
- | |
| 05 | 2.4322: Use or replace with energy efficient substitutes | $1,960 | $908 |
$1,960
30,624
kWh
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,535 | $2,600 |
$1,535
23,980
kWh
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $491 | $255 |
$491
7,665
kWh
|
- | |
| TOTAL RECOMMENDED | $40,277 | $96,726 |
$51,842
810,009
kWh
|
$(-11,565.0)
-
Tgal
|
||
| TOTAL IMPLEMENTED | $15,028 | $29,218 |
$15,028
234,797
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs