ITAC Assessment: UU0158
ITAC logo
ITAC Assessment: UU0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $500
k
to 1
M
# of Employees 17
Plant Area 37,000
ft2
Annual Production 3,000
bbl
Production Hrs. Annual 1,872
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,589 152,880
kWh
Electricity Demand $8,930 545
kW-mo/yr
Natural Gas $18,090 2,690
MMBtu
Waste Disposal Costs
Water Usage $31,650 930
Tgal
Gaseous Waste $6,933 26,000
lb
TOTAL YEARLY COSTS $71,193
RECOMMENDED SAVINGS* $13,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,928

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Gaseous Waste Savings Personnel Changes Savings
01 3.1175: Use a different or recycled raw material $6,933 $50,000 - - - $6,933
-
lb
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,811 $160 - - $2,811
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,726 $2,762 $743
20,072
kWh
$901
-
kW-mo/yr
- - $82
04 2.7444: Close holes and openings in building such as broken windows $740 $800 - - $740
-
MMBtu
- -
05 4.661: Level zero – install control systems for existing equipment $451 $1,100 $451
12,190
kWh
- - - -
06 3.1161: Eliminate/reduce an operation $445 - - - - $445
-
lb
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $306 $260 $306
8,275
kWh
- - - -
TOTAL RECOMMENDED $13,412 $55,082 $1,500
40,537
kWh
$901
-
kW-mo/yr
$3,551
-
MMBtu
$7,378
-
lb
$82
TOTAL IMPLEMENTED $2,928 $4,122 $1,500
40,537
kWh
$901
-
kW-mo/yr
- $445
-
lb
$82
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Gaseous Waste Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs