ITAC Assessment: SD0176
ITAC logo
ITAC Assessment: SD0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Photo albums, sheet - protectors, and CD holders
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 126,836
ft2
Annual Production 150,000,000
pieces
Production Hrs. Annual 7,344
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $290,912 4,424,092
kWh
Electricity Demand $99,792 10,015
kW-mo/yr
Natural Gas $2,414 373
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $799,915 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $181,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,704 - $4,126
62,427
kWh
$578
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,636 $1,250 $3,720
56,272
kWh
$916
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $878 $500 $589
8,792
kWh
$289
-
kW-mo/yr
-
04 2.4224: Upgrade controls on compressors $6,499 $22,356 $4,678
70,926
kWh
$1,821
-
kW-mo/yr
-
05 2.7144: Install spectral reflectors / delamp $16,243 $15,295 $11,688
177,022
kWh
$4,555
-
kW-mo/yr
-
06 3.5315: Lease / purchase baler; sell cardboard to recycler $14,812 - - - $14,812
07 4.441: Install automatic packing equipment $133,998 $30,000 - - $133,998
08 4.444: Install system to collect scrap $618,145 $200,000 - - $618,145
TOTAL RECOMMENDED $799,915 $269,401 $24,801
375,439
kWh
$8,159
-
kW-mo/yr
$766,955
TOTAL IMPLEMENTED $181,770 $69,401 $24,801
375,439
kWh
$8,159
-
kW-mo/yr
$148,810
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs