ITAC Assessment: UU0146
ITAC logo
ITAC Assessment: UU0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area 27,000
ft2
Annual Production 31,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,840 483,449
kWh
Natural Gas $20,890 4,078
MMBtu
Waste Disposal Costs
Water Usage $14,329 3,148
Tgal
TOTAL YEARLY COSTS $102,058
RECOMMENDED SAVINGS* $48,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,877

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings By-product Production Savings
01 3.1175: Use a different or recycled raw material $37,500 $225,000 - - - - - $37,500
02 2.8114: Change rate schedules or other changes in utility service $2,186 $2,000 - - - - $2,186
-
Tgal
-
03 2.4235: Remove or close off unneeded compressed air lines $1,780 - $1,780
12,900
kWh
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,035 $350 $1,035
7,500
kWh
- - - - -
05 2.2136: Install / repair insulation on steam lines $850 - - - - $850
-
MMBtu
- -
06 2.6231: Utilize controls to operate equipment only when needed $693 $2,575 $693
5,020
kWh
- - - - -
07 2.2491: Use cooling air which cools hot work pieces for space heating $367 $1,200 $50
362
kWh
$317
-
kW-mo/yr
- - - -
08 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $231 $1,100 $36
264
kWh
- - $195
-
MMBtu
- -
09 2.2533: Replace air curtain doors with solid doors $97 $75 $97
702
kWh
- - - - -
10 2.8121: Apply for tax-free status for energy purchases $3,482 $1,000 - - $3,482 - - -
TOTAL RECOMMENDED $48,220 $233,300 $3,691
26,748
kWh
$317
-
kW-mo/yr
$3,482 $1,045
-
MMBtu
$2,186
-
Tgal
$37,500
TOTAL IMPLEMENTED $1,877 $75 $1,877
13,602
kWh
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs