ITAC Assessment: UD0444
ITAC logo
ITAC Assessment: UD0444
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product automotive parts
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 331
Plant Area 80,500
ft2
Annual Production 0
units
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $361,572 5,948,711
kWh
Natural Gas $52,873 10,603
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,048

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $15,232 $15,000 - - - $15,232
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,000 - $4,500
-
kWh
- $(-1,500.0) -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,048 $8,000 $7,042
298,359
kWh
$(-1,994.0)
-
MMBtu
- $1,000
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,528 $4,550 $2,763
44,549
kWh
$(-235.0)
-
MMBtu
- -
05 2.4133: Use most efficient type of electric motors $5,137 $8,000 $6,082
106,096
kWh
$(-945.0)
-
MMBtu
- -
TOTAL RECOMMENDED $31,945 $35,550 $20,387
449,004
kWh
$(-3,174.0)
-
MMBtu
$(-1,500.0) $16,232
TOTAL IMPLEMENTED $9,048 $8,000 $11,542
298,359
kWh
$(-1,994.0)
-
MMBtu
$(-1,500.0) $1,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs