| Assessment Year | 2016 |
|---|---|
| Principal Product | Fabricated metal |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 100 |
| Plant Area |
110,000
ft2
|
| Annual Production | 330,000
units
|
| Production Hrs. Annual | 2,750
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $62,094 | 835,991 |
kWh
|
$0.074 | |
| Electricity Demand | $11,218 | 3,796 |
kW-mo/yr
|
$2.96 | |
| Natural Gas | $29,449 | 3,692 |
MMBtu
|
$7.98 | |
| Wood | $395 | 1,010 |
MMBtu
|
$0.39 | |
| Waste Disposal Costs | |||||
| Other Liquid (non-haz) | $4,330 | 3,300 |
gal
|
$1.31 | |
| TOTAL YEARLY COSTS | $107,486 | ||||
| RECOMMENDED SAVINGS* | $29,751 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $23,062 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4226: Use / purchase optimum sized compressor | $2,781 | $4,200 |
$1,940
26,109
kWh
|
$841
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $513 | $100 |
$694
9,334
kWh
|
$169
-
kW-mo/yr
|
- | $(-150.0) | $(-200.0) | |
| 03 | 2.4226: Use / purchase optimum sized compressor | $16,544 | $29,200 |
$13,299
178,997
kWh
|
$3,245
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $110 | $400 |
$110
1,487
kWh
|
- | - | - | - | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $434 | $150 |
$434
5,841
kWh
|
- | - | - | - | |
| 06 | 2.2491: Use cooling air which cools hot work pieces for space heating | $2,084 | $50 |
$1,675
22,544
kWh
|
$409
-
kW-mo/yr
|
- | - | - | |
| 07 | 3.6192: Use a less expensive method of waste removal | $1,280 | $1,300 |
$(-306.0)
(-4,125)
kWh
|
$(-75.0)
-
kW-mo/yr
|
$1,661
-
gal
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,938 | $9,207 |
$4,065
54,717
kWh
|
$858
-
kW-mo/yr
|
- | - | $1,015 | |
| 09 | 2.7111: Reduce illumination to minimum necessary levels | $67 | $100 |
$67
908
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $29,751 | $44,707 |
$21,978
295,812
kWh
|
$5,447
-
kW-mo/yr
|
$1,661
-
gal
|
$(-150.0) | $815 | ||
| TOTAL IMPLEMENTED | $23,062 | $38,607 |
$18,125
243,956
kWh
|
$4,272
-
kW-mo/yr
|
- | $(-150.0) | $815 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs