ITAC Assessment: UU0138
ITAC logo
ITAC Assessment: UU0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Machinery
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 150,000
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,634 1,650,160
kWh
Electricity Demand $84,441 6,854
kW-mo/yr
Electricity Fees $22,397 -
Natural Gas $10,594 1,300
MMBtu
Waste Disposal Costs
Water Usage $2,388 1,200
Tgal
TOTAL YEARLY COSTS $198,454
RECOMMENDED SAVINGS* $27,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,479

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,221 $18,137 $8,148
169,753
kWh
$5,840
-
kW-mo/yr
- $233 -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,044 $2,760 - $9,908
-
kW-mo/yr
$(-864.0) - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,911 - $1,911
39,810
kWh
- - - -
04 2.7135: Install occupancy sensors $1,089 $1,500 $1,089
22,690
kWh
- - - -
05 2.7241: Install outside air damper / economizer on hvac unit $615 - $615
12,816
kWh
- - - -
06 2.4221: Install compressor air intakes in coolest locations $599 $150 $32
664
kWh
- - - $567
TOTAL RECOMMENDED $27,479 $22,547 $11,795
245,733
kWh
$15,748
-
kW-mo/yr
$(-864.0) $233 $567
TOTAL IMPLEMENTED $27,479 $22,547 $11,795
245,733
kWh
$15,748
-
kW-mo/yr
$(-864.0) $233 $567
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs