Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product NA
NAICS 712130: Zoos and Botanical Gardens
SIC 7999: Amusement and Recreation Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 1,873,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 3,150
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,778 3,341,177
kWh
Electricity Demand $97,338 9,007
kW-mo/yr
Electricity Fees $137,517 -
Natural Gas $119,929 40,406
MMBtu
Waste Disposal Costs
Water Usage $69,908 338,673
Tgal
TOTAL YEARLY COSTS $566,469
RECOMMENDED SAVINGS* $30,703 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,848

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,503 - - $9,796
-
kW-mo/yr
$2,707 -
02 2.3212: Optimize plant power factor $5,444 $5,000 - - $5,444 -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,630 $3,140 $1,920
45,386
kWh
$2,537
-
kW-mo/yr
$832 $(-659.7)
-
MMBtu
04 2.7423: Reduce heat gain by window tinting $3,392 $10,800 $2,329
55,066
kWh
$801
-
kW-mo/yr
$263 -
05 2.2622: Replace existing chiller with high efficiency model $1,833 $4,266 $1,335
31,554
kWh
$375
-
kW-mo/yr
$123 -
06 2.6218: Turn off equipment when not in use $980 - - - - $980
-
MMBtu
07 2.7447: Install vinyl strip / high speed / air curtain doors $854 $1,702 $178
4,217
kWh
$200
-
kW-mo/yr
$65 $410
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $681 $1,463 $263
6,214
kWh
$315
-
kW-mo/yr
$103 -
09 2.7224: Reduce space conditioning during non-working hours $386 - $333
7,868
kWh
- - $53
-
MMBtu
TOTAL RECOMMENDED $30,703 $26,371 $6,358
150,305
kWh
$14,023
-
kW-mo/yr
$9,538 $784
-
MMBtu
TOTAL IMPLEMENTED $20,848 $8,165 $774
18,299
kWh
$10,310
-
kW-mo/yr
$8,320 $1,444
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs