ITAC Assessment: UU0105
ITAC logo
ITAC Assessment: UU0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Cabinetry
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 242
Plant Area 132,000
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 6,630
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,515 1,343,574
kWh
Electricity Demand $50,684 7,533
kW-mo/yr
Natural Gas $53,000 6,118
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $6,120 $8,220 - $6,120
-
kW-mo/yr
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,370 - - $6,370
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,340 $3,385 $4,000
142,480
kWh
$3,340
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,620 $430 $1,970
70,130
kWh
$1,650
-
kW-mo/yr
- - -
05 2.4239: Eliminate or reduce compressed air usage $440 $170 $300
10,730
kWh
$140
-
kW-mo/yr
- - -
06 2.4224: Upgrade controls on compressors $3,000 $2,300 $3,000
106,700
kWh
- - - -
07 2.2437: Recover waste heat from equipment $5,980 $4,365 - - $5,980
-
MMBtu
- -
08 3.1291: Eliminate practice of mixing waste streams $15,140 $40,000 $(-2,400.0)
(-85,550)
kWh
$(-2,700.0)
-
kW-mo/yr
- $12,960 $7,280
TOTAL RECOMMENDED $48,010 $58,870 $6,870
244,490
kWh
$14,920
-
kW-mo/yr
$5,980
-
MMBtu
$12,960 $7,280
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs