ITAC Assessment: UU0102
ITAC logo
ITAC Assessment: UU0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Aluminum Parts
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 363,800
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,500 958,680
kWh
Electricity Demand $70,951 6,740
kW-mo/yr
Natural Gas $327,108 43,052
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $123,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $114,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $88,420 $3,500 $2,020
72,770
kWh
- - $86,400
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,430 $4,040 $1,230
44,070
kWh
$1,200
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $540 $620 $370
13,390
kWh
$170
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $23,250 $8,290 - - $23,250
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $8,990 $78,390 $4,590
165,000
kWh
$4,400
-
kW-mo/yr
- -
TOTAL RECOMMENDED $123,630 $94,840 $8,210
295,230
kWh
$5,770
-
kW-mo/yr
$23,250
-
MMBtu
$86,400
TOTAL IMPLEMENTED $114,100 $15,830 $3,250
116,840
kWh
$1,200
-
kW-mo/yr
$23,250
-
MMBtu
$86,400
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs