ITAC Assessment: IA0061
ITAC logo
ITAC Assessment: IA0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Ice Cream
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 162,600
ft2
Annual Production 0
units
Production Hrs. Annual 5,168
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $923,014 15,134,525
kWh
Natural Gas $302,258 95,684
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $228,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,038

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 2.1332: Convert combustion equipment to burn natural gas $136,096 $379,828 - - $136,096
-
Tgal
02 2.2621: Modify refrigeration system to operate at a lower pressure $68,521 $75,677 $32,045
647,714
kWh
$36,476
-
MMBtu
-
03 2.1224: Replace boiler $15,800 $23,150 - $15,800
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,928 $1,939 $3,928
58,030
kWh
- -
05 2.2511: Insulate bare equipment $3,751 $3,660 - $3,751
-
MMBtu
-
06 2.1213: Direct warmest air to combustion intake $220 $353 - $220
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $110 $120 $110
1,758
kWh
- -
TOTAL RECOMMENDED $228,426 $484,727 $36,083
707,502
kWh
$56,247
-
MMBtu
$136,096
-
Tgal
TOTAL IMPLEMENTED $4,038 $2,059 $4,038
59,788
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs