ITAC Assessment: UU0088
ITAC logo
ITAC Assessment: UU0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Guidance Systems
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 238,000
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,063,868 33,278,102
kWh
Natural Gas $147,500 25,937
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,208 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.5122: Replace high resistance ducts, pipes, and fittings $51,720 $68,760 - - - $51,720
02 2.4239: Eliminate or reduce compressed air usage $703 $6,400 $86
3,100
kWh
$617
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $1,915 $900 $1,170
42,380
kWh
$745
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $17,670 $19,930 - - $17,670
-
MMBtu
-
05 2.2414: Use waste heat from hot flue gases to preheat $6,940 $30,000 - - $6,940
-
MMBtu
-
06 2.3212: Optimize plant power factor $15,260 $13,990 - - - $15,260
TOTAL RECOMMENDED $94,208 $139,980 $1,256
45,480
kWh
$1,362
-
kW-mo/yr
$24,610
-
MMBtu
$66,980
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs