Assessment Year | 2005 |
---|---|
Principal Product | Guidance Systems |
NAICS | 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur |
SIC | 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments |
Sales Range | $100 M to 500M |
# of Employees | 600 |
Plant Area |
238,000
ft2
|
Annual Production | 4,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,063,868 | 33,278,102 |
kWh
|
$0.032 |
Natural Gas | $147,500 | 25,937 |
MMBtu
|
$5.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,208 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.5122: Replace high resistance ducts, pipes, and fittings | $51,720 | $68,760 | - | - | - | $51,720 | |
02 | 2.4239: Eliminate or reduce compressed air usage | $703 | $6,400 |
$86
3,100
kWh
|
$617
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,915 | $900 |
$1,170
42,380
kWh
|
$745
-
kW-mo/yr
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $17,670 | $19,930 | - | - |
$17,670
-
MMBtu
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $6,940 | $30,000 | - | - |
$6,940
-
MMBtu
|
- | |
06 | 2.3212: Optimize plant power factor | $15,260 | $13,990 | - | - | - | $15,260 | |
TOTAL RECOMMENDED | $94,208 | $139,980 |
$1,256
45,480
kWh
|
$1,362
-
kW-mo/yr
|
$24,610
-
MMBtu
|
$66,980 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs