ITAC Assessment: UU0080
ITAC logo
ITAC Assessment: UU0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product whey
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 32,500
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 3,000
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,995 8,429,759
kWh
Electricity Demand $38,131 13,672
kW-mo/yr
LPG $1,262,013 2,036,282
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,095 $3,040 $7,315
269,458
kWh
$3,780
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $5,900 - $5,900
217,320
kWh
- -
03 2.4133: Use most efficient type of electric motors $681 $2,276 $449
16,577
kWh
$232
-
kW-mo/yr
-
04 2.2414: Use waste heat from hot flue gases to preheat $23,294 $70,000 $1,930
71,120
kWh
$1,874
-
kW-mo/yr
$19,490
-
MMBtu
05 2.1213: Direct warmest air to combustion intake $6,535 - - - $6,535
-
MMBtu
TOTAL RECOMMENDED $47,505 $75,316 $15,594
574,475
kWh
$5,886
-
kW-mo/yr
$26,025
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs