ITAC Assessment: UU0056
ITAC logo
ITAC Assessment: UU0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product stainless steel pieces
NAICS 332323: Ornamental and Architectural Metal Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 48,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 2,416
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,038 516,424
kWh
Electricity Demand $5,165 2,014
kW-mo/yr
Electricity Fees $1,293 -
Natural Gas $14,495 26,275
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $679

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $335 $1,600 $(-21.0)
(-600)
kWh
$(-4.0)
-
kW-mo/yr
$360
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $325 $121 $270
8,100
kWh
$55
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $244 $58 $181
5,500
kWh
$63
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $223 $136 $165
5,000
kWh
$58
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $190 $266 $134
4,100
kWh
$56
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $110 $490 - - $110
-
MMBtu
TOTAL RECOMMENDED $1,427 $2,671 $729
22,100
kWh
$228
-
kW-mo/yr
$470
-
MMBtu
TOTAL IMPLEMENTED $679 $669 $451
13,600
kWh
$118
-
kW-mo/yr
$110
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs