ITAC Assessment: OR0322
ITAC logo
ITAC Assessment: OR0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Storage Bins, Baghouses
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 42,000
ft2
Annual Production 750,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,659 967,761
kWh
Electricity Demand $18,557 4,346
kW-mo/yr
Electricity Fees $3,746 -
Natural Gas $10,415 1,893
MMBtu
LPG $2,654 270
MMBtu
Other Gas $1,576 14,331
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,475 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 3.1192: Reduce scrap production $22,000 $12,480 - - - $(-4,000.0)
-
lb
$26,000
02 3.5248: Separate and recycle scrap metal to foundry or for sale $1,960 $180 - - - $1,960
-
lb
-
03 2.3212: Optimize plant power factor $3,399 $5,800 - - $3,399 - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,116 $1,000 $604
25,498
kWh
$512
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $28,475 $19,460 $604
25,498
kWh
$512
-
kW-mo/yr
$3,399 $(-2,040.0)
-
lb
$26,000
TOTAL IMPLEMENTED $22,000 $12,480 - - - $(-4,000.0)
-
lb
$26,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs