ITAC Assessment: UU0048
ITAC logo
ITAC Assessment: UU0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product rubber hose
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 240,000
ft2
Annual Production 9,000,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,380 2,695,200
kWh
Electricity Demand $29,304 69,084
kW-mo/yr
Electricity Fees $480 -
Coal $87,492 75,842
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,903 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Coal Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,985 $306 $1,032
41,300
kWh
$953
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $440 $432 $229
9,200
kWh
$211
-
kW-mo/yr
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,920 $40,000 $7,758
310,300
kWh
$7,162
-
kW-mo/yr
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $19,330 $9,176 - - $19,330
-
MMBtu
- -
05 2.1213: Direct warmest air to combustion intake $1,040 $947 - - $1,040
-
MMBtu
- -
06 2.2113: Repair or replace steam traps $16,294 $5,000 - - $16,294
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $480 - $169
6,700
kWh
$311
-
kW-mo/yr
- - -
08 2.2136: Install / repair insulation on steam lines $493 $518 - - $493
-
MMBtu
- -
09 3.4115: Recover and reuse cooling water $9,920 $7,907 - - - $9,920
-
Tgal
-
10 3.5218: Reuse / recycle/ sell rubber products $1 - - - - - $1
-
lb
TOTAL RECOMMENDED $64,903 $64,286 $9,188
367,500
kWh
$8,637
-
kW-mo/yr
$37,157
-
MMBtu
$9,920
-
Tgal
$1
-
lb
TOTAL IMPLEMENTED $19,330 $9,176 - - $19,330
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Coal Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs