Assessment Year | 2003 |
---|---|
Principal Product | salt |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | n/a |
# of Employees | 141 |
Plant Area |
75,000
ft2
|
Annual Production | 600,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $346,458 | 12,490,820 |
kWh
|
$0.028 |
Electricity Demand | $191,395 | 278,436 |
kW-mo/yr
|
$0.69 |
Natural Gas | $202,461 | 168,129 |
MMBtu
|
$1.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,568 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,395 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $3,833 | $5,820 | - |
$3,833
-
kW-mo/yr
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,032 | - | - |
$5,032
-
kW-mo/yr
|
|
03 | 2.4133: Use most efficient type of electric motors | $13,718 | $32,302 |
$9,484
330,277
kWh
|
$4,234
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,467 | $1,500 |
$1,048
36,510
kWh
|
$419
-
kW-mo/yr
|
|
05 | 2.4314: Use synthetic lubricant | $4,235 | $400 |
$3,280
114,231
kWh
|
$955
-
kW-mo/yr
|
|
06 | 2.4239: Eliminate or reduce compressed air usage | $790 | $400 |
$188
6,548
kWh
|
$602
-
kW-mo/yr
|
|
07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,677 | - |
$1,711
59,568
kWh
|
$966
-
kW-mo/yr
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $816 | $406 |
$583
20,287
kWh
|
$233
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $32,568 | $40,828 |
$16,294
567,421
kWh
|
$16,274
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $16,395 | $32,302 |
$11,195
389,845
kWh
|
$5,200
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs