ITAC Assessment: UU0037
ITAC logo
ITAC Assessment: UU0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,171
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,372 2,823,788
kWh
Electricity Demand $79,517 9,948
kW-mo/yr
Electricity Fees $18,276 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,120 - - $1,120
-
kW-mo/yr
02 2.4221: Install compressor air intakes in coolest locations $675 $420 $378
12,536
kWh
$297
-
kW-mo/yr
03 2.3212: Optimize plant power factor $1,896 $2,861 - $1,896
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,174 $20 $655
21,737
kWh
$519
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,586 $230 $1,444
47,916
kWh
$1,142
-
kW-mo/yr
TOTAL RECOMMENDED $7,451 $3,531 $2,477
82,189
kWh
$4,974
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs