| Assessment Year | 2002 |
|---|---|
| Principal Product | custom woodwork |
| NAICS |
n/a
|
| SIC | 2431: Millwork |
| Sales Range | $10 M to 50M |
| # of Employees | 122 |
| Plant Area |
n/a
|
| Annual Production | 16,000,000
thousand feet
|
| Production Hrs. Annual | 0
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $50,474 | 1,854,821 |
kWh
|
$0.027 |
| Electricity Demand | $59,143 | 6,984 |
kW-mo/yr
|
$8.47 |
| Electricity Fees | $12,892 | - |
|
- |
| Natural Gas | $64,840 | 10,279 |
MMBtu
|
$6.31 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,120 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,422 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $4,720 | $4,461 | - |
$4,720
-
kW-mo/yr
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $688 | $1,688 |
$394
12,906
kWh
|
$294
-
kW-mo/yr
|
- | |
| 03 | 2.4314: Use synthetic lubricant | $2,551 | $1,000 |
$1,459
47,936
kWh
|
$1,092
-
kW-mo/yr
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,484 | - |
$848
27,868
kWh
|
$636
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,217 | $11,405 |
$2,328
76,475
kWh
|
$1,889
-
kW-mo/yr
|
- | |
| 06 | 2.2437: Recover waste heat from equipment | $1,481 | $1,158 | - | - |
$1,481
-
MMBtu
|
|
| 07 | 2.4221: Install compressor air intakes in coolest locations | $1,422 | $116 |
$813
26,722
kWh
|
$609
-
kW-mo/yr
|
- | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,557 | $235 |
$890
29,243
kWh
|
$667
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $18,120 | $20,063 |
$6,732
221,150
kWh
|
$9,907
-
kW-mo/yr
|
$1,481
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $12,422 | $7,500 |
$4,404
144,675
kWh
|
$8,018
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs