ITAC Assessment: UD0556
ITAC logo
ITAC Assessment: UD0556
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Corrugated boxes and shipping containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 175,000
ft2
Annual Production 66,000
ton
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,797 4,762,310
kWh
Electricity Demand $156,812 10,176
kW-mo/yr
Natural Gas $225,791 63,672
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $227,563 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $227,563

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.122: Develop standard procedures to improve internal yields $189,046 - - - - - $2,700 $4,538 $762 $181,046
02 3.5316: Contract a wood pallet recycling company $19,800 - - - - - - $19,800 - -
03 2.1133: Adjust burners for efficient operation $8,037 $200 - - $8,037
-
MMBtu
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,225 $11,147 $1,381
65,944
kWh
$1,844
-
kW-mo/yr
- - - - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,784 - $1,193
56,858
kWh
$1,591
-
kW-mo/yr
- - - - - -
06 3.4116: Meter recycled water (to reduce sewer charges) $2,459 - - - - $2,459
-
Tgal
- - - -
07 2.3212: Optimize plant power factor $1,680 $2,250 - $1,680
-
kW-mo/yr
- - - - - -
08 2.4221: Install compressor air intakes in coolest locations $532 $200 $532
25,205
kWh
- - - - - - -
TOTAL RECOMMENDED $227,563 $13,797 $3,106
148,007
kWh
$5,115
-
kW-mo/yr
$8,037
-
MMBtu
$2,459
-
Tgal
$2,700 $24,338 $762 $181,046
TOTAL IMPLEMENTED $227,563 $13,797 $3,106
148,007
kWh
$5,115
-
kW-mo/yr
$8,037
-
MMBtu
$2,459
-
Tgal
$2,700 $24,338 $762 $181,046
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs