ITAC Assessment: UU0022
ITAC logo
ITAC Assessment: UU0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Treadmills
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 64,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 5,030
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,643 2,668,480
kWh
Electricity Demand $56,292 6,799
kW-mo/yr
Electricity Fees $15,655 -
Natural Gas $97,802 27,254
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,760

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,290 $53,909 $8,385
278,271
kWh
$8,905
-
kW-mo/yr
- - -
02 2.3212: Optimize plant power factor $5,007 $7,160 - $5,007
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,373 $365 $2,293
76,172
kWh
$1,600
-
kW-mo/yr
- - $(-520.0)
04 2.7145: Install skylights $21,234 $34,000 $6,872
228,027
kWh
$14,362
-
kW-mo/yr
- - -
05 2.4321: Upgrade obsolete equipment $18,175 $80,000 - - $18,175
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $1,022 $326 $578
19,176
kWh
$444
-
kW-mo/yr
- - -
07 3.5313: Increase amount of waste recovered for resale $32,358 $17,100 - - - $48,998
-
lb
$(-16,640.0)
TOTAL RECOMMENDED $98,459 $192,860 $18,128
601,646
kWh
$30,318
-
kW-mo/yr
$18,175
-
MMBtu
$48,998
-
lb
$(-17,160.0)
TOTAL IMPLEMENTED $41,760 $24,951 $2,871
95,348
kWh
$7,051
-
kW-mo/yr
- $48,998
-
lb
$(-17,160.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs