Assessment Year | 2002 |
---|---|
Principal Product | Treadmills |
NAICS |
n/a
|
SIC | 3949: Sporting and Athletic Goods, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
64,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 5,030
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $70,643 | 2,668,480 |
kWh
|
$0.026 |
Electricity Demand | $56,292 | 6,799 |
kW-mo/yr
|
$8.28 |
Electricity Fees | $15,655 | - |
|
- |
Natural Gas | $97,802 | 27,254 |
MMBtu
|
$3.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $98,459 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,760 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,290 | $53,909 |
$8,385
278,271
kWh
|
$8,905
-
kW-mo/yr
|
- | - | - | |
02 | 2.3212: Optimize plant power factor | $5,007 | $7,160 | - |
$5,007
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,373 | $365 |
$2,293
76,172
kWh
|
$1,600
-
kW-mo/yr
|
- | - | $(-520.0) | |
04 | 2.7145: Install skylights | $21,234 | $34,000 |
$6,872
228,027
kWh
|
$14,362
-
kW-mo/yr
|
- | - | - | |
05 | 2.4321: Upgrade obsolete equipment | $18,175 | $80,000 | - | - |
$18,175
-
MMBtu
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,022 | $326 |
$578
19,176
kWh
|
$444
-
kW-mo/yr
|
- | - | - | |
07 | 3.5313: Increase amount of waste recovered for resale | $32,358 | $17,100 | - | - | - |
$48,998
-
lb
|
$(-16,640.0) | |
TOTAL RECOMMENDED | $98,459 | $192,860 |
$18,128
601,646
kWh
|
$30,318
-
kW-mo/yr
|
$18,175
-
MMBtu
|
$48,998
-
lb
|
$(-17,160.0) | ||
TOTAL IMPLEMENTED | $41,760 | $24,951 |
$2,871
95,348
kWh
|
$7,051
-
kW-mo/yr
|
- |
$48,998
-
lb
|
$(-17,160.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs