ITAC Assessment: UU0020
ITAC logo
ITAC Assessment: UU0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Sporting Goods
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 312
Plant Area 110,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,336 9,038,216
kWh
Electricity Demand $166,709 21,719
kW-mo/yr
Electricity Fees $49,276 -
Natural Gas $223,906 38,990
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,793

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $11,006 $21,657 $7,807
259,053
kWh
$3,199
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,242 $2,173 $1,601
53,125
kWh
$641
-
kW-mo/yr
- - -
03 2.4314: Use synthetic lubricant $1,257 $800 $897
29,752
kWh
$360
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $1,089 $489 $777
25,833
kWh
$312
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,441 $2,664 $1,503
49,886
kWh
$938
-
kW-mo/yr
- - -
06 2.2514: Cover open tanks $739 $100 - - $739
-
MMBtu
- -
07 3.8225: Replace hexavalent chromium solutions with trivalent solutions $716 - - - - - $716
-
lb
08 3.4156: Use flow control valves on equipment to optimize water use $6,853 $1,570 - - - $6,853
-
Tgal
-
09 3.4113: Treat and reuse rinse waters $50,183 $98,800 - - - $50,183
-
Tgal
-
TOTAL RECOMMENDED $76,526 $128,253 $12,585
417,649
kWh
$5,450
-
kW-mo/yr
$739
-
MMBtu
$57,036
-
Tgal
$716
-
lb
TOTAL IMPLEMENTED $15,793 $25,610 $10,984
364,524
kWh
$4,809
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs