ITAC Assessment: UU0017
ITAC logo
ITAC Assessment: UU0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Printing
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 15,000
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 4,590
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,446 245,160
kWh
Electricity Demand $7,064 864
kW-mo/yr
Electricity Fees $2,247 -
Natural Gas $2,726 291
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $971

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $519 $1,815 $283
8,787
kWh
$236
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $694 $700 - - $694
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $277 $220 $151
4,683
kWh
$126
-
kW-mo/yr
-
TOTAL RECOMMENDED $1,490 $2,735 $434
13,470
kWh
$362
-
kW-mo/yr
$694
-
MMBtu
TOTAL IMPLEMENTED $971 $920 $151
4,683
kWh
$126
-
kW-mo/yr
$694
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs